GET PRO+
Share:

An image depicting the trail Wildwood Trail and its surrounding area.
star 4.6 (10) · Medium

Wildwood Trail

Multnomah County, Oregon

Photos (5)

Trail length

46.5 km

Time

3 days

Elevation Gain

702 m

Hike Type

Multi Day

“The Wildwood Trail enchants with verdant forests, historic landmarks, and accessible adventures for diverse hikers.”

Spanning approximately 46 kilometers (around 28.5 miles) with an elevation gain of about 700 meters (roughly 2300 feet), the Wildwood Trail is a point-to-point trek nestled in the scenic Forest Park near Multnomah County, Oregon. This trail is rated as medium difficulty, offering a mix of challenges and enjoyable stretches that make it a favorite among hikers of varying skill levels.

Getting to the Trailhead The trailhead is conveniently located near the city of Portland, making it accessible by both public transport and car. For those opting for public transportation, the TriMet bus system provides a route that stops near the entrance of Forest Park, where the southern end of the Wildwood Trail begins. If driving, you can park at the trailhead near the Vietnam Veterans Memorial in Washington Park, which is a significant landmark close to the coordinates of the trail's starting point.

Navigating the Trail As you embark on the Wildwood Trail, you can rely on the HiiKER app for detailed maps and navigation assistance. The trail is well-marked with blue diamond-shaped blazes, ensuring that hikers can easily follow the path without straying.

Landmarks and Scenery The Wildwood Trail meanders through a lush, old-growth forest, featuring towering Douglas firs, western hemlocks, and red cedars. Approximately 5 kilometers (3 miles) into the hike, you'll encounter the iconic Pittock Mansion, a historic house museum that offers panoramic views of Portland and the Cascade Range. This is an excellent spot for a brief rest and a photo opportunity.

Continuing on, the trail crosses numerous streams and wooden bridges, with the soothing sounds of water often accompanying your journey. Around the 12-kilometer (7.5-mile) mark, you'll reach the Audubon Society of Portland, a place dedicated to the conservation of Oregon's native birds and wildlife. Here, you can learn about local conservation efforts and possibly spot some of the area's feathered inhabitants.

Flora and Fauna The Wildwood Trail is home to a diverse array of plant and animal life. Hikers can expect to see a variety of ferns, wildflowers, and mosses that blanket the forest floor and trees. Wildlife sightings may include black-tailed deer, squirrels, and numerous bird species, such as the pileated woodpecker and the Pacific wren.

Historical Significance The region surrounding the Wildwood Trail is steeped in history. Forest Park itself was established in the early 20th century and is one of the largest urban forest reserves in the United States. The trail passes near the site of the 1905 Lewis and Clark Centennial Exposition, which celebrated the centenary of the Lewis and Clark Expedition.

Trail Etiquette and Safety Hikers are reminded to practice Leave No Trace principles to preserve the natural beauty of the trail. It's also important to be prepared for the trail's length and varying terrain by bringing adequate water, food, and layers of clothing. Cell service can be spotty in the forest, so plan accordingly and inform someone of your hiking itinerary.

Seasonal Considerations The Wildwood Trail is accessible year-round, but the best time to hike is from late spring to early fall when the weather is more predictable, and the trail conditions are generally drier. During the wetter months, the trail can be muddy, and extra caution should be taken on slippery sections.

Whether you're seeking a full-day adventure or planning to tackle sections of the trail over multiple visits, the Wildwood Trail offers a quintessential Pacific Northwest hiking experience through the heart of Portland's majestic Forest Park.

AI Planner

Days planned around your pace, with somewhere to stay each night.

What to expect?

Wheelchair Friendly
Historic Landmarks
Wildlife
Dog Friendly

Activity types

Wildlife Viewing
Wildflower Viewing

Frequently asked questions

How long is the Wildwood Trail in Portland and how hard is the full hike?

The full Wildwood Trail is 46.49 km, or about 28.9 miles, with roughly 702 m of elevation gain. It is generally rated medium difficulty, but the point-to-point format and overall distance make it a substantial full-day or multi-day effort for most hikers.

Where does the Wildwood Trail start and end in Forest Park?

The Wildwood Trail runs the length of Forest Park from W Burnside Road at the south end to NW Newberry Road at the north end. The southern access is tied into Washington Park, and the route is widely known as the 30-mile spine of Forest Park.

How is the Wildwood Trail marked and is it easy to follow?

The Wildwood Trail is marked with blue diamond blazes, including frequent markers through Washington Park and Forest Park. Navigation is usually straightforward on the main route, but the many intersecting park trails mean extra attention is useful at signed junctions, especially near trailheads and road crossings.

Can dogs go on the Wildwood Trail in Forest Park?

Dogs are allowed on the Wildwood Trail, but they must be on a leash in Forest Park. All trails in the park are open to people on foot, and dog owners are expected to pack out waste and follow posted park rules at trailheads and junctions.

Where can you park for the Wildwood Trail in Portland?

One of the best-known southern access points for the Wildwood Trail is near the Vietnam Veterans Memorial in Washington Park. Other access points exist along Forest Park, but Washington Park is a common place to start because it connects directly to the south end of the route and nearby park facilities.

Can you reach the Wildwood Trail by public transit from Portland?

Yes. The south end of the Wildwood Trail is accessible from Washington Park by TriMet, including the Washington Park MAX station and Bus Line 63. That makes the southern trail access one of the easiest long urban-forest hikes in Portland to reach without a car.

What are the main sights along the Wildwood Trail?

Major landmarks along the Wildwood Trail include Washington Park, the Barbara Walker Crossing over W Burnside Street, and Pittock Mansion, which sits near the route and is known for broad views over Portland. The trail also passes through dense Forest Park woodland with Douglas fir, western hemlock, and cedar.

Comments and Reviews

User comments, reviews and discussions about the Wildwood Trail, Oregon.

4.6 star

average rating out of 5

10 rating(s)


View Map

Wildwood Trail mobile static map

Nearby Hikes

Choose which optional cookies and similar technologies HiiKER can use on this device. Privacy & cookie policy